8. Multiple Layer-2 Switches
Goal: Emulate the behavior of five Layer-2 Switches connected together for traffic fail-over testing. Return to LANforge-ICE Cookbook
In this test scenario, the function of several layer-2 switches will be emulated using multiple LANforge Bridge devices with Spanning Tree Protocol (STP) so that each bridge can be connected to at least two others and fail-over tests can be demonstrated.
| A: On the Layer-3 tab, select all 15 connections and click Start |
|
| B: In Netsmith, verify traffic is flowing through
sw-3 or sw-4 via 3 separate WanLinks
• In this case, VRWL1.1.001, VRWL-1.1.003 and VRWL-1.1.006 all show traffic flowing |
|
| C: Right-click WanLink VRWL-1.1.001 and select Toggle WanLink |
|
| D: After approximately 1 minute, the traffic will find an alternate path |
|
| E: Right-click WanLink VRWL-1.1.001 and select Toggle WanLink |
|
| F: After approximately 1 minute, traffic resumes on its original path |
|
| G: Traffic flow after simulating multiple path failures
• A sample LANforge HTML report of this fail-over test can be found here:
|
|
Email Candela Technologies at: support@candelatech.com if you have any questions or suggestions.
www.candelatech.com | sales@candelatech.com | +1 360 380 1618
Candela Technologies, 2026 Main Street, Suite A, P.O. Box 3285, Ferndale, WA 98248, USA
www.candelatech.com |
sales@candelatech.com | +1 360 380 1618
Last modified: Fri Mar 11 09:52:45 PST 2011